Skip to Content

Universal Appointments and Time Reservations v.17

The tool for time-based service management from booking appointments to sales and reviews

398€ 358€

The price is valid till September, 15 (according to the promo campaign August-September 2026).
The tool does not require extra dependencies besides standard Odoo apps.
Current version: 17.0.1.3.26

Enterprise
Community
Odoo.sh

This is an Odoo full-featured app to administrate, control, and improve service management workflow. The tool lets you organize flawless time reservations, control fulfillment, evaluate customer satisfaction, sale and upsell goods in almost any industry. With all options installed, the tool represents a structured e-shop for your services.

Flexible module setup allows you to reflect specifics of your business or even multiple businesses: automate resources distribution or let select those; have predefined appointment duration or let choose it manually; show or hide prices; apply booking restrictions or grant full freedom. Apply your own settings to automate the provision of your services.

 
 
Reservation quick preview

Smart time slots

Vacant slots for appointments are automatically generated based on working calendars, service peculiarities, and specifics of managed businesses

Universal reservations

Set up the structure of resources and services to reflect your company's workflows. Assign specialists and equipment manually or automatically. Flexibly manage appointment duration rules

Comfortable scheduling without conflicts

The appointment scheduler allows making a new reservation in a few clicks. It is quick and simple but with full control over potential intersections

Innovative appointments calendar

Users administrate reservations from the single calendar view: with quick filtering by appointment details and instant access to required information

Clear website bookings

Let portal partners and website visitors schedule an appointment through the configurable multi-step process of checkout and confirmation

Sell and upsell services

Link bookings with Odoo sale orders and price lists. Boost revenues by upselling accessories

Customer satisfaction and reports

Automatically request client reviews. Analyze appointments by planned and tracked duration, generated revenue

Customizable website and portal pages

Turn on/off optional layout elements. Introduce your own titles and welcome texts. Exclude booking steps

Compatible with Odoo standard features

The app is configurable for multi companies and for multi-website environments. Appointment resources might be linked with employees, while reservations - with Odoo quotations

Custom details and reminders

Apply popup alarms, add success emails, and prepare SMS reminders. Introduce custom fields for reservations, resource types, resources, and services.

Comprehensive and well thought booking app

The app allows backend user to do some simple configuration to make the booking app able to fit in our different business models.
Very good support and also there is module enhancement from time to time with great usability improvements of more use cases.

kwchan@mtsoln.com in the Odoo Apps Store

Just great App and the best support you can imagine

Dear Olga and Alex
Thank you so much for this function which makes the tool perfect!
I've already installed it and tested it -- it works exactly the way the customers need it
This really makes your Appointment App the best tool available for Odoo :-)
I would also like to thank you for understanding my wishes and for taking care of them. That's exactly why I will choose and recommend faotools the nex time again.

Tom Lanbacher, Clixmedia GmbH in the Odoo Apps Store

Innovative backend scheduling

Auto time slots generation

  • Slots are generated according to resource business calendars. Each resource has its own working time and leaves: it is impossible to schedule an appointment when an employee or equipment is absent
  • The algorithm is based on the service settings: duration, time step, rounding, checkout period, and extra calendar restrictions. You can flexibly configure the appearance and final choice of time slots
  • The app lets plan specific business activities both of predefined duration or of the one entered manually
  • For each service, it is possible to define extra resources required to provide that. The busyness of those resources is also taken into account
  • Per each resource type, define when an appointment might be scheduled. For example, time slots are available not later than 2 days before, and not earlier than 30 days before. Similar rules are applicable for re-scheduling and cancellations
  • Reserved time slots are not available for other bookings. Even not yet-confirmed appointments (pre-reservations) temporarily block target slots. Pre-reservation will be canceled if not done within a specified period (you may change this limit on the configuration page)
  • If the resource type is configured for that, the app will also consider simple meetings of responsible-for-resources users as busy time slots
  • The tool is also perfect for multi-timezone appointments. Either let users choose the time zone by themselves (default is the OS browser timezone), or set the same timezone for all cases

Smart Odoo reservations

  • No appointment might be entered manually, but it should be selected among available slots and according to the principles you set up
  • To start new scheduling pick up a required time period on the calendar: the wizard will be automatically initiated. Chosen dates are used as the time range for slots
  • In the wizard, you can change which resource type, resource, and service should be scheduled. The tool automatically checks and restricts viable options
  • As soon as wizard details are filled up, the tool will generate and show time slots. A manager should merely select the desired one
  • When a slot is selected, the app automatically adds chosen type and service, allocates a proper resource, and assigns reservation responsible
  • Slot selection also means that the period is pre-reserved and can not be used for other bookings
  • Afterward, the only thing left is to enter client details or choose an existing customer
  • If needed, let managers schedule a few appointments simultaneously (regulated by the special setting on the configuration page). For a single or a few resource types/resources/services
  • From the appointments calendar, you may also re-schedule reservations. To that end just drag and drop an event, and the tool will prepare possible time slots. The principles of calculating availability are the same as for simple scheduling.
Appointments planning calendar in Odoo
Time slots for Odoo reservations
Client details for Odoo appointments

Universal website bookings

  • Scheduling an appointment through the Odoo portal and website is organized as the multi-steps checkout process
  • A customer searches among resource types and selects a required one. For example, "Beauty salon" or "Class C Cars". The step will not be shown if there is a single published resource type for this website
  • A customer navigates over resources available for this type and chooses one, a few, or applies any (all). For example, "Hair Dresser John Brown" or "Opel Astra 1234". The step is missed in case there is a single published resource, or the chosen resource type assumes automatic allocation
  • A customer chooses the desired service provided by selected resources. For example, "Classic Hair Cutting" or "Car Rent Class C". Clients would not be asked to choose a service if there is only one published on this website
  • A customer is shown available time slots. The interface lets adopt time frames for search, change the time zone, and insert duration (for services with manual duration). Each action results in slots' recalculation. Website visitors might be optionally allowed to book a few time slots for a chosen service
  • A time slot selection is required and might be not missed. As soon as pre-reservation is done, nobody else can book the same slot. Simultaneously, clients have limited time to make confirmation after which pre-reservation will be canceled (the exact time is up to you)
  • After pre-reservation appears, you may force the public (not logged-in users) to sign in, only offer to do so, or just let them add their details
  • A customer should enter contact details, a set of which might be configured per website. By default required ones are name and email. Previously registered (portal) users would have fields auto-populated. Optionally add here a checkbox to agree with the terms and conditions
  • Optionally ask customers to confirm their email or mobile number. If the confirmation option is turned on, website visitors will be obliged to insert received codes. In case a correct code is not introduced in time (set up on the configuration page), appointments will be canceled. If you selected SMS confirmation (the feature depends on Odoo SMS IAP) but your balance is not sufficient, a confirmation code would be forwarded by email
  • As soon as all steps are done, a customer receives a confirmation email and is redirected to the success page/new appointments(s) page. For not yet registered users, Odoo will offer to enter the password for the Odoo portal
  • Optionally configure success redirection to a created sale order, so a customer may sign/pay that right after finishing the reservation (based on the Odoo standard sales workflow)
  • Optionally set up automatic canceling of website/portal appointments that are not paid within the specified period. To that goal, go to a resource type form, and find the setting 'Possible Canceling' on the tab 'Sales'. The feature works only for auto-sent sale orders. In this way, you may force clients to prepay reservations
  • During the whole process, customers might see the progress bar (if you have not purposefully turned it off). The progress bar lets safely return to any previous step.

Configurable appointment pages

  • Show/hide the progress bar. Introduce your own names for progress steps
  • Show/hide introduction blocks, images, and short descriptions for resource types, resources, and services
  • Prepare your own full details pages for resource types, resources, and services using Odoo's standard website builder. Show/hide links for those pages
  • Show/hide pre-reservation and confirmation timers
  • Choose the contact details fields required to be entered. Define custom fields that should be entered for appointments
  • Define filters and sorting criteria for resource types, resources, and service pages
  • Show/hide the agreement with terms and conditions for portal/public users. Introduce your own text and link for that agreement
  • Show/hide prices

Portal control of reservations

  • Customers may control their appointments right in the Odoo portal
  • Portal users observe the list of planned and done appointments and may check any of those
  • The Odoo portal allows you to schedule new or repeat existing reservations, cancel or re-schedule planned ones
  • Each appointment has a chatterbox that allows direct communication with the resource manager and other followers
  • From the portal appointment page, users can also print a voucher, so reservation confirmation
  • If an appointment has a linked sale order (sent, confirmed, or done) it would be also available through the standard Odoo portal entries 'Quotations' and 'Sale Orders', and right from the reservation page
  • Based on the Odoo standard sales functionality, customers may also sign and pay orders linked to their reservations.
Website list of businesses for appointments
Website resource booking page
Website service reservation page
Website time booking page
Confirmation code email to finish the appointment
Interactive booking progress bar
Show/hide introduction and other elements for time slots
Appointment portal full details

Structured service management

Resource types

  • Resource types might be particular businesses you manage. For example, 'beauty salon', 'dentistry', or just 'hairdressers'
  • Another approach is to consider a resource type as a group of particular resources. For instance, 'class B cars' and 'class C cars' for rental business
  • Resource types contain main settings of how to organize service provision: how to allocate resources, how to calculate appointment total price, what are time restrictions, which services are possible, etc.

Resources

  • A resource in many service businesses assume certain specialists: For example, 'Dentist John Brown', 'Hairdresser Anna Green'
  • In other companies, it might be particular equipment or facility. For instance, 'Mercedes A1231', 'Room 12'
  • Resources are the Odoo object which working calendar you are planning. Thus, they define available days, timetables and time-offs, responsible users, etc.

Services

  • An appointment service defines what actually should be done. For instance, 'consultation', 'tooth surgery', 'classic hair cutting', 'car class C rent'
  • Services are not equal to Odoo products, but they are linked to each other to manage pricing details
  • Services regulate time settings of appointments (how long should it take, when it can be started, what is the time step, extra restrictions and extra services needed), which goods might be suggested as complementaries

3 layers to reflect specifics

  • The decision of what to consider resource types, resources, and services is completely up to you. Such an approach lets reflect almost any service business
  • The tool does not force you to have multiple instances for each layer. In simple cases, there might be just a single representative for each step. For example, Lawyers - Attorney Chris Black - Consultation
  • If there is a single option, the app would reflect that by simplifying appointment scheduling. So, steps without actual choice are auto-missed.
List of resource types to manage
List of resources for reservation
An unlimited number of Odoo service businesses
Car rental business: setup

Sale and upsell services

Sale orders and appointments

  • The app lets you link appointments and sale orders. You have 4 configuration options
  • Sent sale orders: if chosen, a sent quotation would be prepared based on the appointment. This way, a portal user will be able to sign and pay such a quotation. The method is suitable in case your service is standard, and you accept customer approval/online payment
  • Automatically confirmed sale orders: if chosen, a sale order would be created as soon as an appointment is scheduled. The method is suitable in case your service is standard, and final sale positions and details would hardly be changed during that appointment. For example, fixed-price hair cutting
  • Draft sale orders: if chosen, only a quotation would be generated. In such a way you would be more flexible in updating an order during service provision or beforehand. For example, if you want to add extra complementaries during a visit or to grant clients individual discounts
  • Manual sale orders: if chosen, managers would have to create quotations while providing service. The method might be applicable when most of the sale lines become clear only during the visit itself. For example, a mobile phone repair business assumes initial diagnostics and only after that offers the price
  • Until an appointment sale order is not confirmed, you would be also able to update that right from a reservation form. Both service, quantity, and complementary products are re-calculated in that case

Service pricing

  • The tool lets you configure pricing method per each resource type
  • Per planned duration: if chosen, Odoo quotations would be created based on initial reservation plans. For example, it might be suitable for car rental or massage
  • Per units: if chosen, sale orders consider appointments for the same price disregarding their duration. For example, standard haircutting or tire mounting is invoiced the same disregarding how much time they take
  • Per tracked (real) duration: when you want to invoice actual time spent on service provision. For example, the approach might be suitable for consultation or legal services
  • Prices are price list dependent. It means, that a manager might select individual conditions during scheduling. In such a way, it is possible to apply various currencies, discounts, promos
  • The latter feature is also applicable to website/portal users. In case there are a few to-select price lists, users would be able to choose the most suitable (e.g. in the correct currency). For the portal users, their partner price list is selected by default

Complementaries and upselling

  • When a client finishes scheduling, it seems a good moment to increase a bill by offering complementary products. The tool aims to help you with that
  • Odoo will show the popup with suggested products for backend managers immediately after reserving a time slot
  • Website visitors/portal customers will see an accessories dialog also when they select the time for reservation
  • The popup allows both adding one or a few complementaries or merely missing the step if suggested products are not required
  • The feature is turned on/off on the configuration page: for the backend in general and for each website. The popup will be shown only in case there are complementaries defined for a booked service.
Suggested appointment products
Website: suggested products' popup
Service settings and suggested products
Appointment and sale order relation
Appointment services and complementaries to be sold

Flexible configuration and automatization

Service time settings

  • It is possible to configure the service to have a rigid duration (for example, standard hairdressing always lasts an hour) or let clients/managers select that manually (for example car rental might take from a day or 60 days)
  • Duration is defined either in hours (for example, it might be suitable for consulting or repair) or in days (for example, applicable for equipment or room rent, conference translator services)
  • For the manual duration, it is possible to apply restrictions: the maximum/minimum order and the multiplier. For instance, you can simply apply the rule: a service should last not less than an hour, not more than 8 hours, but the duration should be always multiplied by 30 minutes (1:20 is not possible, while 01:00 and 01:30 are fine)
  • The app allows configuring the rule to round time slots start. Sometimes applied restrictions might result in a calculated start you do not like. For example, an hour-long service start at 12:23 is hardly good. To solve the problem you can simply set up rounding for an hour (other available options are 5, 10, 30 minutes; 2 hours; midnight, or midday tomorrow)
  • Together with duration, 'Slots step' defines the frequency of available time periods, including whether it is possible to have overlapping periods. When the chosen duration is equal to the slots step, there would be no intersections: 12:00-13:00; 13:00-14:00 for the duration and the slots step set as an hour. When the duration is bigger than the slots step, periods would be intersected: 12:00-13:00; 12:30-13:30; 13:00-14:00 for the duration of one hour and the slots step 30 minutes. Finally, if the duration is smaller than the slots step, there would be breaks between the periods: 12:00-13:00; 13:30-14:30 for the duration of one hour, and the slots step 90 minutes
  • The checkout period is the setting that might give resources to finish service until the next one is started. For example, to have a cleanup after room rental, assign manual duration in days with the rounding 14:00 and with the checkout period 2 hours. Then, the potential time slot for a customer would be 01/08 14:00 - 03/08 12:00, while the resource would be anyway registered for the whole period 01/08 14:00 - 03/08 14:00
  • If there are certain restrictions on the service in addition to the resource timetable, introduce the 'Extra service calendar'. For example, although your beach is open 24/7, sunbed rental is available only from 08:00 to 17:00. Thus, you can define its own service working time
  • Sometimes it might be necessary to define when the service provision cannot be started or finished. To that goal, the app allows defining restrictions.
    For daily services, the settings Start/End Day Restriction may be used. They let configure weekdays or specific dates when start/finish is impossible. For example, accepting/discharging patients is not fine on weekends and holidays but indoor treatment is possible. So, for the service 'Indoor treatment' block Saturdays and Sundays using the named setting.
    For hourly services, distinguish the Start/End Working Calendar. This option assumes that this service may be started or finished only within predefined shifts. For example, although products are available for rent 24/7, your shop works from 10 am to 6 pm. With the setting, you may set up 10:00-20:00 and 11:00-21:00 shifts but block 09:00-19:00 and 18:00-23:00

Resource allocation

  • When there are a few resources of the same type, the challenge of how to distribute appointments among those arises. There are 2 general approaches introduced by the app
  • Manual allocation - applied when each resource is unique, and you prefer to give clients a right to select among those. For example, a customer would like to be consulted by a certain doctor or to be serviced by a definite hairdresser. Manual allocation does not force a client to select resources. This is the right, which might be simply missed by explicitly choosing "any" or a few resources
  • Automatic allocation - applied when all resources are considered equally good for clients. For example, a customer would hardly compare Opel Astra 1234 vs. Opel Astra 1235. Automatic allocation is configured per each resource type depending on your business specifics
  • Automatic distribution by resource workload lets assign appointments according to the total planned duration of all open appointments. For example, it might be fair in a beauty salon to equally spread tasks
  • Automatic allocation by appointment number does not take into account real duration, but only absolute quantity. For example, it might be suitable for tire mounting where the price is set up not per duration but per units
  • Automatic distribution by order means that each resource has its own priority, and allocation is done on a queue basis. Thus, the resource with the highest priority will be always chosen until it has available slots for the target moment. After that, the second-important resource is under consideration until it is also occupied, and so on. For example, such an approach might work for facilities booking or car rental

Resource aliases and extra service resources

  • When a service requires multiple resources then it is possible to assign special service rules. The app lets configure as many extra resources involved as it is needed
  • Each service extra resource rule assumes either resource types or resources that alternatively are required for the service. For example, either any resource of the type 'Rooms' OR the resource 'Hall 1' OR the resource 'Openspace'
  • If there are a few rules, to reserve service at least a single resource in each line should be available. Thus, the number of extra appointment resources will equal the number of service rules. If some of the lines cannot result in a real resource, a service cannot be reserved. Please take into account that alias resources cannot be extra resources: their prime resources will be used instead
  • When a resource is involved in a few business activities (so, relates to different resource types and has different services), use resource aliases. A resource alias is a resource that does not have its own working calendar and its own responsible user. Instead of that, it uses the prime resource settings. For example, Anita Oliver can be both a hairdresser and a dental consultant. Then, you should create the prime resource 'Anita Oliver' (the type 'Beauty salon'), and the alias resource 'Anita Oliver' (the type 'Dentistry') with the prime 'Anita Oliver, Beauty Salon'. In this way, she can be reserved both for the 'hair dressing' service and for the 'Dental consultation', but the busyness in one sphere will block availability in the other
  • Alias resources have their own configuration, including description, image, sale settings, etc. So, the only differences from the normal resources are a working calendar and a responsible user, which are taken from their prime resource.
Service duration and price setup
Appointment resource aliases
Advanced reservation settings

Complementary features

Configurable reminders

  • The app allows preparing of 3 types of appointment alerts: pop-ups, emails, and SMS. You can quickly create those through the special configuration menu entry. SMS reminders are sent using the Odoo SMS server (make sure that you have sufficient balance for Odoo SMS IAP)
  • Select default alarms for each resource type. Such alarms will be automatically applied to all new appointments of this type. Otherwise, you may choose those for specific appointments
  • Define who should be notified: a responsible manager, external followers (clients), internal followers, or all followers. Popup alarms are available only for backend users
  • Specify a period for alert: it is possible to apply a time range in days, hours, or minutes. For instance, 2 days before the scheduled date
  • For SMS and email alarms, you should also assign a template that is rendered based on appointment details.

Misc

  • Optionally configure automatic requests for a customer review when an appointment is done. Clients should select among 3 simple "smiles": satisfied, not satisfied, and highly dissatisfied. The final rating is calculated for resource types, resources, and services
  • The tool has its own report view, where you can analyze appointments on pivot and graph views
  • Appointments have automatic numbering. You may change its logic (suffix, prefix, step, etc.) by configuring the related Odoo sequence
  • Each appointment has a printing version that might be generated in the backend and optionally in the portal, and which is attached to all appointment confirmation emails. The printing version relies upon standard Odoo layouts and might be also used as a service voucher.

Optional add-ons features

  • The app allows appointment managers to track time spent on providing service. This "real" time might be used not only for statistics but also to calculate the total appointment price.
  • The tool lets link resources and employees to automatically apply working calendars of the latter for appointments of this resource
  • Appointments might be shown on the special Odoo Enterprise Gantt view for instant resources workload observation.
Universal appointments Gannt
Resource type reminders for linked reservations
Booking review request
Appointment pivot and graph views
Real time spent on appointments

Secured appointments

  • The tool introduces its own user rights system to make sure business data is secured. For the backend users, there are 2 groups that are allowed to work with appointments: "Appointments: Only Own" and "Appointments: Administrator"
  • Appointments admins are allowed to manage all settings and update any appointment-related objects of their company(s)
  • The 'only own' group has limitations and its users have rights: (a) only to read resource types and services; (b) to observe only resources, in which they are responsible managers or which do not have such managers at all; (c) to create and to update appointments related to resources which they can observe
  • Portal and website security is managed independently
  • Resource types, resources, and services should be website published in order to become available for selection for both public and portal visitors
  • Any website visitor might schedule an appointment and access resources/services without registration if you turned the option "Business appointments on website"
  • Portal users have the same rights even if the latter option is not turned on, but you switched the option "Business appointments in portal".

Custom fields

  • Custom attributes creation does not require any technical knowledge. In order to show a new property, just add a new field and enter the details
  • The tool lets prepare new fields for resource types, resources, services, and reservations
  • It is possible to add custom fields of the following types: single-line text (char), simple text without formatting (text), rich text (HTML-formatted text), integer or float numbers, drop-down choice with your own options (selection), checkbox (boolean), date or date and time, binary (a file to upload), reference to another Odoo document (e.g. for sale order, contact; many2one)
  • The tool lets you comfortably select an interface position of a custom field from a closed list of options. Optionally you may select also portal/website position to make properties visible to public users
  • For the website booking process, it is possible to force users to select custom appointment details
  • Have different resource fields depending on resource type (for example, dentists' details differ from cars' details).
Appointment: a complete list of custom details
Appointment input form: custom details
Appointment custom form view
Reservation custom portal view

Configuration and Installation Tips for Universal Appointments and Time Reservations Odoo v.17

Python dependency

The tool depends on the external Python library 'phonenumbers'. Install this library for your Odoo server through the command:

pip3 install phonenumbers

Frequently Asked Questions about Universal Appointments and Time Reservations Odoo v.17

What is an appointment voucher? How can I change it?

The appointment has its own pdf attachment (voucher). This attachment is generated automatically based on Odoo web templates. With certain technical skills or with a help of any Odoo partner/vendor, it is possible to modify that template (as it is done per Odoo quotations, invoices, etc). By default, it uses the standard company layout introduced within the app.

Is it possible to reserve a few services/resources simultaneously during a single booking?

In the backend, it is possible to turn on the ‘Multi scheduling’ option, then the manager will be able to make several bookings for a customer for different services/resources and choose several time slots. In the portal, there is the ‘Multi scheduling’ option. It allows the customer to book one service/resource, but for several time slots. To book more than one service/resource, the customer should do several bookings.

Which sort of notifications would/may appointments managers receive?

For managers/specialists, you may configure subscriptions per resource type and resources. For example, notifications regarding new appointments are linked to the email subtype 'New appointments and recovering'. Besides, the app allows to set up reminders to alarm involved parties. Have a look at the appointments app > Configurations > Reminders.

Do customers have email and printing confirmation for a booking?

As soon as all steps are done, a customer receives a confirmation email and he/she is redirected to the success page by default (a pdf with a voucher is attached to such email). On the success page, it is possible to print the voucher as well.

What is a pre-reservation on the stage 'Waiting for confirmation'?

When a client starts reserving service and chooses a time slot, it becomes unavailable for other users and pre-reservation occurs. In order to make it available again, you need to set the maximum time for the reservation. After this time, if the client didn't complete the reservation, the time slot will be available again.

To set the time for pre-reservation:

1. Open the Appointments app

2. Go to Configuration>Configuration

3. In the 'Maximum Period for Pre-Reservation' set the time

If we have several branches, can we divide the resources by them?

The resource division might be configured differently. One approach is to rely upon Odoo multi companies. As you create resources types/resources/services, you can optionally specify the company they relate to. Or you can make them ‘global’, related to all companies. Thus, the set of resource types/resources/services may be different for each company.

It is also possible, to set the appointments process differently on different websites/branches. Just choose the website to show particular resource type/resources/services. These branches may even be connected to completely different spheres, for example, one site may be used to book English lessons and the second one to book the time in a gym.

Even without assigning different companies or websites, it is possible to set up appointments for different spheres of your business. The app is designed in such a way, that you can on your own decide which step to relate to your businesses. For example, you can consider one resource type as a dentist clinic in the city center and the second one as surgical dentistry in a residential area. This way, using resource types, you will be able to manage different branches and divide the resources by them even without a multi-companies environment.

Is it possible to firstly select service and then resource?

No. To simplify user interactions, available services are defined per each resource type and per each resource. That is why it is logically impossible to firstly select a service.

Can a user make an appointment without creating an account?

Yes, a user can create an appointment without creating an account, but only for the first time. As a person makes an appointment, his email is reserved in the base and cannot be used again. So for further registrations, or for existing contacts, it is necessary to log in, in order to make an appointment.

A user can sign up either from confirmation email or right in Odoo. Invitation link is short-lived, so if a user missed the opportunity, he/she would have to reset a password afterwards or ask for your help.

How can I change the language of the success emails?

To change the language of an email template:

1. Make sure, that you have the target languages installed in your Odoo.

2. Then, turn on the developer mode and go to Technical > Templates

3. There, find the template 'Appoints: Success Email'

4. Start editing the template, and click on the language icon in the top right corner of the article's template.

5. You will see the article's body in all system languages. Manually translate the target language email, but don't delete the code. Save the result.

After that, you also need to change the contact's language to the preferred one (can be changed on the contact's card in the field 'Language'). Then, such contacts will receive the email in this language.

If a person makes an appointment for the first time on your website, then, by default, the opened site's language will be assigned to them. And the confirmation email in that language will be sent.

What does the field 'Start Round' on the service card stand for?

The field 'Start round' rounds the time to this number, to avoid cases, when the time doesn't look good. For example, if now the time is 9:48 and I should book a service no later than a day before it, then the first available time tomorrow will be 9:48, which is not a good time. But, if you choose to round for an hour (01:00), then the available time will be 10:00.

To see some more options and examples of the way to round the time ('Help'), hover over the field's title.

I don't like appearance of generated emails / SMS

You are welcome to customize those. Please find templates under the menus Configuration > Notifications > Email Templates and SMS Templates.

Besides, you may apply different templates for different resource types. Have a look at any resource type > Notifications.

I do not need all steps during website checkout. May I exclude / hide some?

The tool already does it automatically for you:

  1. if there is a single published resource type, the first step would not be shown;

  2. if resource allocation method is automatic or there is a single published resource, the second step would be missed;

  3. if there is a single published service for chosen resource type / resources, then the third step would be missed.

The only step which should be configured is the confirmation page: you may turn it on /off on the configuration page.

How to change appointment reference number?

Appointments numbering is based on Odoo standard sequences. So, in the developer mode go to the technical settings > Sequences & Identifiers > Sequences > find one with the name "Business Appointments". You are welcome to apply any changes.

What are the update policies of your tools?

According to the current Odoo Apps Store policies:

  • Every module bought for version 12.0 and prior gives you access to all versions up to 12.0.
  • Starting from version 13.0, every module version should be purchased separately.
  • Disregarding the version, purchasing a tool grants you a right to all updates and bug fixes within a major version.

Please note that the faOtools team does not control those policies. For all questions, please contact the Odoo Apps Store representatives directly.

How can I install your app on Odoo.sh?

The most straightforward approach is to use the Odoo store's built-in workflow:

1. Open the module's page and click the button Deploy on odoo.sh

2. After that, you will be redirected to the GitHub page. Log in to your account, then click 'Create a new repo' or use an existing one. Please ensure your repository is private. It is not permitted to publish the apps under the OPL-1 license. If necessary, create a new repo for your Odoo.sh project

3. Then, go to odoo.sh and click the Deploy button. In the pop-up window, submit the decision and click 'Continue.' This action will trigger the installation process.

These steps will install the app for your project's production branch. If you want to deploy the apps for other branches or update the module, you should undertake the following actions:

1. Upload the source code for the app from the Odoo store

2. Commit the module to a required GitHub repository. Ensure none of the app folders/files are ignored (i.e., not included in your repo's .gitignore). Repositories are automatically created by odoo.sh and may include some crucial items by default (e.g., /lib). You should upload all module directories, subdirectories, and files without exceptions

3. Deploy a target branch of the odoo.sh project or, if your settings assume that, wait until it is automatically built.

How should I install your app on my own server?

1. Unzip the source code of the purchased tools in one of your Odoo add-ons' directories;
2. Re-start the Odoo server;
3. Turn on developer mode (technical settings);
4. Update the apps' list (the apps' menu);
5. Find the app and push the button 'Activate'/'Install';
6. Follow the guidelines on the app's page if those exist.

I noticed that your app has extra add-ons. May I purchase them afterwards?

Yes, sure. Simultaneously, Odoo automatically adds all dependencies to a cart, so you should exclude previously purchased tools to avoid double payment.

I deployed your app on Odoo.sh and see warning/error in tests

A red/orange warning does not influence the app's features. Regretfully, sometimes our modules do not pass standard automatic tests since the latter assume behavior that conflicts with our app's goals. For example, we change the price calculation, while the standard Odoo module tests compare the final price to a standard algorithm.

So, first of all, please check the deployed database features. Does everything work correctly?

If you still assume that the warning influences real features, please contact us and forward full installation logs and the full list of deployed modules (including core and third-party ones).

May I buy your app from your company directly?

No, we only distribute the tools through the official Odoo apps store.

I would like to get a discount

Regretfully, we do not have the technical means to provide individual prices. 

May I install the app on my Odoo Online (SaaS) database?

No, third-party apps can not be used on Odoo Online. Unfortunately, Odoo SaaS blocks such a possibility.

Your tool has dependencies on other app(s). Should I purchase those?

Yes, our tool requires all modules marked in dependencies to work correctly. The price marked on the app page already includes all necessary dependencies.

What is the price for the module in US Dollars? Why did it change?

The price for our modules is set in euros. The Odoo store converts prices to other currencies according to its internal exchange rate. Thus, the price in US Dollars may change when the exchange rate is updated.

Odoo demonstration databases (live previews)

For this app, we might provide a free personalized demo database.

You do not need a phone number or credit card to contact us. You should only pass a short email sign-up, which does not take more than 30 seconds.

By your request, we will prepare an individual live preview database, where you can apply any tests and check assumptions for about two weeks.

Bug reporting

If you encounter bugs or inconsistent behavior, do not hesitate to contact us. We guarantee to provide fixes within 60 days of purchase and are intensely interested in improving our tools even after this period.

You do not need a phone number or credit card to contact us. You should only pass a short email sign-up, which does not take more than 30 seconds.

Please include as many details as possible in your request: screenshots, Odoo server logs, a full description of how to reproduce your problem, and so on. Usually, it takes a few business days to prepare a working plan for an issue (if a bug is confirmed) or provide you with guidelines on what should be done (otherwise).

Public features requests and module ideas (free development)

We are strongly motivated to improve our tools and would be grateful for any feedback. If your requirements are of public use and might be efficiently implemented, the team will include those in our to-do list.

Such a to-do list is processed regularly and does not assume extra fees. Although we cannot promise deadlines and final design, it might be a good way to get desired features without investments and risks.

You do not need a phone number or credit card to contact us. You should only pass a short email sign-up, which does not take more than 30 seconds.

17.0.1.3.26
  • The constraint on negative checkout time has been added.
17.0.1.3.25
  • The issue with the untranslated warnings has been fixed.
17.0.1.3.24
  • The issue with selected dates in formats other than Latin has been fixed.
17.0.1.3.22
  • The issue with duplicated extra resources for appointments is fixed.
17.0.1.3.21
  • The default activity view for resource types, resources, and services now is kanban.
17.0.1.3.20
  • Intersection conflict checks are restructured and optimized.
17.0.1.3.19
  • The feature to add extra working hours for alias resources is added. Such shifts will restrict time slots in addition to the main resource calendar.
17.0.1.3.18
  • The rating calculation is fixed for resources and services.
You may also like the tools
Cloud Storage Solutions

The tool to flexibly structure Odoo attachments in folders and synchronize directories with cloud clients: Google Drive, OneDrive/SharePoint, Nextcloud/ownCloud, Dropbox, Amazon S3, Box, and NAS. DMS. File Manager. Document management system

398€ 358€
OneDrive / SharePoint Odoo Integration

The tool to automatically synchronize Odoo attachments with OneDrive files in both ways

487€ 438€
Google Drive Odoo Integration

The tool to automatically synchronize Odoo attachments with Google Drive files in both ways

487€ 438€
KnowSystem: Knowledge Base System

The tool to build a deep and structured knowledge base for internal and external use. Knowledge System. KMS. Wiki-like revisions.

398€
Password Manager

The tool to safely keep passwords in Odoo for shared use. Shared vaults

198€
KPI Balanced Scorecard

The tool to set up KPI targets and control their fulfillment by periods. KPI dashboards. Dashboard designer. KPI charts

198€
MCP Server. AI Chats and LLM Odoo Integration

The tool to manage your Odoo from your favorite AI chats through MCP. Claude. Any MCP-supporting AI.

198€
URL Transliterations for Website Pages

The tool to translate URL addresses of Odoo website pages

38€
Smart Alerts

The tool draws users' attention to essential document details and warnings

38€ 34€